My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> 13. Schedule for installation of and maintenance of bypass pumping piping. <br /> 14. Submit a sewer overflow emergency response plan. The plan will dictate backup <br /> pumping plans, spill containment procedures, spill recovery procedures and <br /> emergency call out phone numbers. <br /> Provision shall be made by the Contractor for the collection of sewage from cutoff lateral <br /> sewers. Lateral sewers shall be reconnected to the main before the termination of every <br /> working day. <br /> The text of Subsection 306-1.6 of the Standard Specifications is hereby deleted and <br /> replaced with the following: <br /> Pipe shall be measured along the longitudinal axis between the ends as laid and <br /> shall include the actual pipe in place. <br /> Following placement and compaction of backfill and prior to the placement of permanent <br /> pavement, all newly constructed PVC sewer mains shall be cleaned and tested for <br /> deflection and ovality by either using: a rigid mandrel for smaller diameter pipe; or laser <br /> profile technology and/or with an electronic deflect-o-meter for larger diameter piping. <br /> The deflection and or ovality shall not exceed (5%) of the inside diameter of the pipe. If <br /> the pipe exceeds this tolerance, it is the responsibility of the contractor to replace and re- <br /> test the newly constructed pipe for deflection and ovality. <br /> If the pipe is to be tested by mandrel, the rigid mandrel shall have a circular cross section <br /> having a diameter of at least 95 percent of the specified inside pipe diameter and shall be <br /> pulled through the pipe by hand. The minimum length of the circular portion of the <br /> mandrel shall be equal to the nominal diameter of the pipe. A 1/4-inch diameter nylon line <br /> shall be pulled from manhole to manhole and shall be left for use in conducting the CCTV <br /> inspection. Obstructions encountered by the mandrel shall be repaired and the pipeline <br /> section shall be retested. <br /> All labor and equipment necessary to conduct these tests shall be furnished by the <br /> contractor. <br /> The contractor shall submit all laser profile documents to the Engineer for review and <br /> approval no later than(10) days after the test. <br /> 6.11 NEW MANHOLE STRUCTURES <br /> Construction of new concrete manhole structures shall be done in accordance with City of <br /> Santa Ana Standard No. 1201, details as shown on the plans, the applicable provisions of <br /> Sections 201, 303, and 306 of the Standard Specifications and these Special Provisions. <br /> This work shall also include the removal and/or modification of any interfering portions of <br /> 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.