My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> existing sewer pipes, drop inlets, PCC encasements, etc., necessary to construct each <br /> manhole structure complete in place. <br /> Concrete for manhole structures shall be Class 560-C-3250. All reinforcing steel used in <br /> these structures shall be Grade 40 minimum. Fly ash additives and/or substitutes shall not <br /> be permitted. <br /> The following is hereby added to Subsection 201-4.1, of the Standard Specification: <br /> Concrete curing compound shall be Type 2. <br /> The following is hereby added to Subsection 303-1.1, of the Standard Specification: <br /> Once any excavation for the construction of a manhole structure is commenced,the <br /> Contractor must diligently pursue the completion of the structure, including <br /> structure backfill, compaction, and restoration of surface improvements and <br /> temporary paving. Open excavations shall be properly barricaded, backfilled or <br /> covered with steel traffic plates to the satisfaction of the Engineer at the end of each <br /> workday. <br /> For new manholes on large sewer mains, or for manholes with extreme depths of cover, a <br /> larger diameter manhole will be required. The design of these larger manholes shall be <br /> reviewed with and approved by the Water Resources Division. The larger manhole cover <br /> shall be in accordance with Standard Plan No. 1211 and these Special Provisions. <br /> For larger manhole frames and covers, the Water Resources Division may require frames <br /> and covers fabricated of fiber reinforced polymer(FRP). These larger FRP manhole frame <br /> and cover sets shall be manufactured by GMI Composites, Inc.,no equal. <br /> The FRP frame and cover system shall meet the following requirements: contain 45 percent <br /> to 70 percent fiber reinforcement; thermoset resin with UV inhibitors to prevent photo <br /> degredation; minimum strength to weight ratio of 750:1; integrated gasket to minimize <br /> traffic shock, abate noise and orders and prevent water entry into manhole; skid slip <br /> resistance greater than 0.6 as described in ASTM C1028 Standard; and dimensional <br /> tolerance of 1/16-inch. <br /> The FRP frame and cover shall be designed to exceed AASHTO H-20loading by a factor <br /> of 2.5 (125,000 pounds) and shall meet AASHTO EN124 D400 loading (89,924 pound <br /> which exceeds AASHTO Proof Load of 50,000 pounds for severe traffic service) proof <br /> load on a 250 mm round plate for 30 seconds. Documentation of certified testing results <br /> shall be submitted including complete Fatigue Loading Test with no loss of carrying <br /> 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.