Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> All CCTV work shall conform to the current NASSCO-PACP Standards for sewer main, <br /> and sewer lateral and these Special Provisions. <br /> 6.19 SEWER FLOW LEVEL MONITORING &ALARMING DEVICE <br /> Contractor shall supply and install a Smart Cover© sewer flow level monitoring and <br /> alarming device as manufactured by Hadronex(760-291-1980). The flow level monitoring <br /> and alarming system shall be compatible with the existing sewer flow level and monitoring <br /> system utilized by the City's Water Resources Division. Included in this item will be the <br /> first year maintenance fee assessed by the alarming company for all sewer flow level <br /> monitoring&alarming devices installed. <br /> 6.20 REPAIR COUPLINGS <br /> For sewer repairs, the Contractor shall use a double banded shielded sewer coupling. The <br /> coupling shall have excellent resistance to heavy earth loads, shear forces and deflection. <br /> The coupling shall be able to connect similar and dissimilar pipe materials and sizes. <br /> Clamps shall be stainless steel and have stainless steel grade 316 nuts and bolts. The gasket <br /> material shall be molded, one-piece elastomeric. The shield shall be heavy-duty, stainless <br /> steel. Increasing the band tension shall secure the pipe ends, forming a watertight, root- <br /> proof seal, impervious to infiltration and exfiltration. Sealing"0"rings under each clamp <br /> prevent the pipe end from slippage, for a reinforced joint seal. <br /> The shielded sewer coupling shall be Flex-Seal©ARC shielded adjustable repair coupling <br /> manufactured by Mission Rubber Company or approved equal. <br /> 6.21 SEWER FLOW BYPASSING <br /> The Contractor is responsible for the temporary handling of sewage, spill prevention and <br /> control, and odor control throughout any sewer flow bypass operation. Temporary <br /> handling of sewage includes bypass pumping, diversion, bypass piping, plugs, flow- <br /> through plugs and other means of handling of sewage flows. Contractor shall provide all <br /> materials, labor, supervision, and equipment for temporary handling of flow, including <br /> preparation and implementation of a spill prevention, control and countermeasure plan <br /> (SPCCP) to facilitate the work. The Contractor shall comply with the Regional Water <br /> Quality Control Board, Health Depattinent, and Air Quality Management District permits <br /> and regulations. <br /> Contractor shall prepare a detailed bypass pumping plan for any temporary handling of <br /> sewage. <br /> Contractor shall be responsible for all aspects of the mobilization, set up, operation, <br /> management, monitoring, maintenance operation, pressure testing, spill containment, and <br /> spill management including clean up. When bypass pumping flows, the Contractor shall <br /> have at least one designated person on site 24 hours per day to operate, monitor and <br /> maintain the bypass pumping system and implement the spill prevention and control <br /> procedures. <br /> 107 <br />