CITY OF SANTA ANA <br /> DEFINITION OF BID ITEMS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> all materials, labor, equipment, tools, and incidentals and no additional compensation will be <br /> allowed therefore. <br /> Bid Item No. 11 - Fiber Optic Splice Enclosure <br /> This work consists of installing a Corning Cable Systems Fiber Optic Splice Closure including <br /> splice trays,pigtails, connectors, and labeling as indicated on plans. <br /> Payment for the installation of Fiber Optic Splice Enclosure, shall be at contract unit price bid <br /> per Each Item listed in the Bid Proposal and shall be considered full compensation for furnishing <br /> all materials, labor, equipment, tools, and incidentals and no additional compensation will be <br /> allowed therefore. <br /> Bid Item No. 12 - Signing and Striping <br /> Removal of all traffic striping and pavement markings shall be by wet blasting. All traffic striping <br /> may be removed by wet sandblasting with the Engineer's approval, shall be completely removed <br /> to the satisfaction of the Engineer. Any damaged pavement due to pavement removal <br /> (Grinding),SHALL be repair to maintain a smooth and uniform surface. All removal areas <br /> shall be slurry sealed by rubberized slurry seal. Slurry seal shall cover from lane line to lane <br /> line unless directed otherwise by the engineer. <br /> Payment for Signing and Striping shall be at the contract unit price bid per Lump Sum listed in the <br /> Bid Proposal,and shall include full compensation for furnishing all labor,materials,tools,equipment, <br /> disposal of all removed materials and incidentals as required,and no additional compensation will be <br /> allowed therefore. <br /> Bid Item No. 13 - Pothole Pole Location for Utility Conflicts <br /> The work under this item consists of potholing for traffic signal equipment location as shown on <br /> the plans. One pothole bid item includes all utilities found in the pothole, not per utility. <br /> The work under this item consists of mobilizing the Contractor's workforce, labor, equipment, <br /> and materials;providing bonds, insurance, and license; demobilizing; and performing final <br /> cleanup. All work shall be performed to the satisfaction of the Engineer. <br /> Payment for Pothole Pole Location for Utility Conflicts shall be considered full compensation <br /> for furnishing all labor, materials, tools, equipment, removals,paving, landscape repair, irrigation <br /> repair, root shaving, sidewalk restoration, pothole and trench backfill per City Std. Plan 1150, <br /> permanent asphalt replacement, permanent PCC replacement and appurtenances for all related <br /> items of work necessary for the installation.No additional compensation will be allowed therefore. <br /> Bid Item No. 14 - Pothole Utilities Not Shown on Plan <br /> Payment for Pothole Utilities Not Shown on Plan, shall be at contract unit price bid per Each <br /> Item listed in the Bid Proposal and shall be considered full compensation for furnishing all labor, <br /> materials, tools, equipment,removals, paving, landscape repair, sidewalk restoration,pothole and <br /> 4 of 8 <br />