Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> b. Business License. Each Prime Contractor and Subcontractor shall obtain and pay for a <br /> Santa Ana Business License. Detailed information concerning business license may be <br /> obtained from the Finance and Management Services Agency, (714) 647-5447, City Hall. <br /> The fees for this license are separate from the Construction permit bid item. <br /> c. Construction Water Permit. Each Prime Contractor or Subcontractor which desires to <br /> obtain water from AGENCY-owned fire hydrants for construction or any other purpose <br /> shall first obtain and pay for a permit from the Corporate Yard of the City of Santa Ana, at <br /> 220 South Daisy Avenue. Information concerning costs and conditions may be obtained <br /> from the AGENCY by calling(714)647-3320. Use of private water from a hose bib is not <br /> allowed. The fees for this permit are separate from the Construction permit bid item. <br /> For safety reasons, the AGENCY will not allow Contractor to stretch construction water <br /> hoses across open traffic lanes. Where required, Contractor shall use water truck. <br /> d. Disposal Permit. In accordance with the procedures of the Orange County General <br /> Services Administration (GSA),the cost for the disposal of all materials at County landfill <br /> sites shall be borne by the Contractor. <br /> e. Building and Electrical Permits. For projects involving building, structural construction, <br /> traffic signal or irrigation controller installation, the Prime Contractor shall obtain the <br /> necessary building and electrical permits from the Planning&Building Agency.There will <br /> be no fees for these permits. <br /> f. State Division of Industrial Safety Permits. In accordance with Section 6500 of the State <br /> Labor Code, permits are required for all excavations, which are five feet or deeper, or for <br /> all structures being built or demolished, which are more than three stories high. <br /> All permits and fees required by all other Agencies having jurisdiction over any part of the work <br /> shall be obtained and paid for by the Contractor, unless otherwise noted on the Plans or in the <br /> General Provisions. <br /> 2-3RIGHT-OF-WAY <br /> Add the following to this subsection: <br /> When the contractor arranges for temporary use of private property for additional work areas and <br /> facilities required for the Contractor's convenience, to meet requirements, or other reason(s), the <br /> Contractor shall provide the City with written agreement authorizing use of said property. <br /> 2-5 THE CONTRACTOR'S EQUIPMENT AM) FACILITIES <br /> 2-5.1 General <br /> Add the following to this subsection: <br /> Pursuant to the authority contained in Section 591 of the Vehicle Code, the Department has <br /> determined that, such areas as are within the limits of the project and are open to public traffic, the <br /> Contractor shall comply with all the requirements set forth in Divisions 11, 12, 13, 14 and 15 of <br /> the Vehicle Code. Attention is directed to the statement in Section 591 that this Section shall not <br /> 5 <br />