My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> relieve him or any person from the duty of exercising due care. The Contractor shall take all <br /> necessary precautions for safe operation of his/her equipment and the protection of the public from <br /> injury and damage from such equipment. <br /> Contractor shall comply, and shall ensure all subcontractors comply, with all applicable <br /> requirements of the most current version of the regulations imposed by California Air Resources <br /> Board (CARB) including, without limitation, all applicable terms of Title 13, California Code of <br /> Regulations Division 3, Chapter 9 and all pending amendments (Regulation). <br /> Throughout the Project, and for three (3) years thereafter, Contractor shall make available for <br /> inspection and copying any and all documents or information associated with Contractor's and its <br /> subcontractors' fleets including, without limitation, the Certificates of Reported Compliance <br /> (CRCs),fuel/refueling records,maintenance records,emissions records, and any other information <br /> the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) <br /> calendar days' notice from the City. <br /> Contractor shall be solely liable for any and all costs associated with compliance with the <br /> Regulation as well as for any and all penalties,fines, damages, or costs associated with any and all <br /> violations, or failures to comply with the Regulation. Contractor shall defend, indemnify and hold <br /> harmless the City, its officials, officers, employees and authorized volunteers free and harmless <br /> from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure <br /> to comply with the Regulation. <br /> 2-8 EXTRA WORK <br /> Add the following to this subsection: <br /> The contractor shall proceed with extra work only upon written order from the Engineer. <br /> 2-10 DISPUTED WORK <br /> Delete the first paragraph and replace it with the following: <br /> If the Contractor considers any work demanded of him to be outside the requirements of the <br /> contract,or if he considers any instruction, ruling or decision of the Engineer to be unfair,he shall <br /> within ten days after any such demand is made or instruction, ruling or decision is given, file a <br /> written protest with the Engineer, stating clearly and in detail his objections and reasons therefore. <br /> Except for such protests and objections as are made of record, in the manner and within the time <br /> above stated, the Contractor shall be deemed to have waived and does hereby waive all claims for <br /> extra work, damages, and extensions, rulings and decisions of the Engineer. <br /> Upon receipt of any such protest from the Contractor, the Engineer shall review the demand, <br /> instruction, ruling or decision objected to and shall promptly advise the Contractor, in writing, of <br /> his final decision, which shall be binding on all parties, unless within the ten working days <br /> thereafter the Contractor shall file with the Executive Director of the Public Works Agency of the <br /> City of Santa Ana a formal protest against said decision of the Engineer. The Executive Director <br /> of the Public Works Agency of the City of Santa Ana shall consider and render a final decision on <br /> any such protest within 30 days of receipt of same. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.