Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> SECTION 4 - CONTROL OF MATERIALS <br /> 4-1 GENERAL <br /> Should the Contractor fail to correct deficiencies or public nuisances that have been created <br /> because of his/her operation, then these will be considered to be of an emergency nature, and will <br /> call for the AGENCY to move in on the project to take corrective action. Such work will be done <br /> on a force account basis with an additional callout charge. There is a minimum two-hour charge <br /> for labor on any callout plus an additional callout charge of$300. <br /> 4-4 TESTING <br /> Add the following to this subsection: <br /> Material testing will be performed by the Orange County EMA Materials Laboratory or a private <br /> laboratory engaged by the AGENCY for the construction of this project. <br /> The AGENCY will bear the cost of testing material which meets the requirements indicated in <br /> these General Provisions. The cost of retesting of material that fails to pass the first test shall be <br /> borne by the Contractor. <br /> SECTION 5 - LEGAL RELATIONS AND RESPONSIBILITIES <br /> 5-2 SPECIAL NOTICES <br /> Add the following to this subsection: <br /> Per Section 1771.4(a)(2) of the California Labor Code, Contractors are required to post job site <br /> notices, as prescribed by regulation. <br /> 5-3 LABOR <br /> 5-3.2 Prevailing Wages <br /> Add the following to this subsection: <br /> Certified Payroll Records shall be submitted to the Engineer every two weeks beginning with the <br /> actual start day of construction, and shall be consecutively numbered until the completion of the <br /> work. Progress payments will be withheld pending receipt of any outstanding reports. <br /> The Contractor shall assure that a qualified supervisor is present at all times when work is being <br /> performed. <br /> 5-4 INSURANCE <br /> 5-4.2 General Liability Insurance <br /> The provisions of this subsection apply except as herein modified: <br /> The Contractor shall provide insurance coverage limits as detailed in the Certificate of Liability <br /> Insurance. The Certificate of Liability Insurance is included in Appendix D of the Contract <br /> Documents. <br /> 12 <br />