My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> The top layer of asphalt concrete pavement shall be a leveling course that shall not exceed <br /> 0.10' in compacted thickness. The leveling course shall be applied over both cold mill and <br /> reconstruction areas concurrently. <br /> Section 302-5.5 entitled "Distribution and Spreading" of the Standard Specifications shall <br /> be modified as follows: <br /> Successive courses shall not be laid upon previously laid courses until 24 hours <br /> after the previous course was laid. <br /> Section 302-5.6.2 entitled "Density and Smoothness" of the Standard Specifications shall <br /> be modified as follows: <br /> When a 10 foot straightedge is laid on the finished surface both parallel and <br /> perpendicular to the centerline of the roadway, the surface shall not vary from the <br /> edge of the straightedge more than 1/8 inch, except at intersections or at changes of <br /> grade. <br /> The Contractor shall construct temporary asphalt concrete ramping with a slope of 1:1 at <br /> the edge of open excavation if all of the following occur: <br /> 1. Clearance between travel lane and open excavation is less than five(5) feet, <br /> 2. Excavation depth is six(6) inches or deeper, and <br /> 3. If open excavation will last for more than 48 hours. <br /> Payment for construction and removal of temporary asphalt concrete shall be included in <br /> other items of work, and no additional compensation shall be allowed therefore. <br /> Work determined by the Engineer to conform to the requirements specified below shall be <br /> adjusted based upon the relative compaction result from each lot tested in accordance with <br /> the following table: <br /> Relative Reduced Relative Reduced <br /> Compaction Compensa- Compaction Compensa- <br /> (Percent) tion Factor (Percent) tion Factor <br /> 95.0 1.000 93.4 0.938 <br /> 94.9 0.998 93.3 0.932 <br /> 94.8 0.996 93.2 0.925 <br /> 94.7 0.994 93.1 0.918 <br /> 94.6 0.991 93.0 0.910 <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.