Laserfiche WebLink
CITY OF SANTA ANA <br /> <br /> <br />EXHIBIT I - 2 <br /> <br /> Monthly Project Status Report <br />Prepare Monthly Project Status Reports that show an accurate accountability of work <br />effort rendered and a continuous appraising and monitoring of both work progress and <br />financial conditions on a project. <br />The fee for project management services, including time and related expenses, shall be included <br />in each task order proposal. <br />Firms may propose on any category listed below (1-5). The services to be performed may <br />include, but shall not be limited to, the following: <br />1. PLANNING, RESOURCES, AND DESIGN <br />Provide water engineering services to conduct water capital improvement projects, which <br />may involve one or multiple disciplines, including planning studies, hydraulic modeling, <br />feasibility studies, design of pipelines, wells, pump stations, pressure regulating stations, <br />reservoirs, water quality and water treatment, waste and recycled water quality and <br />treatment, hydrogeology, engineering support during construction, and encompassing <br />associated services such as Architecture, Structural, Civil, Mechanical, HVAC, Landscape <br />Architecture, Geotechnical, Environmental, Electrical, Instrumentation, and Control. <br />a. Planning Studies and Feasibility Studies <br />Provide engineering, financial, and planning services to perform pipeline alignment and <br />facility siting studies, water system planning studies, recycled water system planning and <br />feasibility studies, water demand and supply studies, rate studies, asset management, <br />and other studies that may be required in water system planning. Provide consulting <br />services related to water resources and conservation. Studies may include water supply <br />assessments, water supply verifications, urban water management plans, water use <br />surveys and others studies that may be required for water resources and conservation <br />programs <br />b. Hydraulic Modeling <br />Perform Water System Master Planning including Comprehensive Studies, Hydraulic <br />Analysis, Transient Analysis, Fire Flow Analysis, and Flow Optimization. <br />c. Condition Assessment <br />Provide comprehensive condition assessment of the City’s water system, including <br />seismic, structural, security and vulnerability. Assessment of the structural integrity of the <br />pipe shall include identifying leaks, pipe damage, pipe defect, loss of pipe wall thickness <br />due to corrosion or erosion, etc., along the length of the pipe. Provide reports and <br />memorandums with maps and exhibits as required to detail results of the study including <br />likelihood of failure, risk and consequence of failure. Reports and/or technical <br />memorandums shall also include detailed explanation of data collected and used for the <br />study, any assumptions made as well as recommendations for short-term and long-term <br />risk mitigation strategies.