My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:03:32 PM
Creation date
2/26/2025 9:36:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/4/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />ADDENDUM No. ONE <br />Project 11-6741 <br />PROPOSAL Project 19-6499 <br />PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER <br />AVENUE TO SAINT ANDREW PLACE <br />PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />12 <br />PCC Curb and Gutter (Type A-2-6) <br />1,035 <br />LF <br />$ <br />$ <br />47.50 <br />49,162.50 <br />13 <br />PCC Curb (Type B-1) <br />4,945 <br />LF <br />$ <br />$ <br />33.00 <br />163,185.00 <br />14 <br />PCC Median Curb (4") <br />460 <br />LF <br />$ <br />$ <br />32.00 <br />14, 720.00 <br />15 <br />Colored Concrete for Median Turn Pocket — <br />2,875 <br />SF <br />$ <br />$ <br />Brick Red, Topcast Exposed Aggregate <br />Finish (T=4") <br />13.50 <br />38,812.50 <br />16 <br />Colored Concrete — Brick Red, Topcast <br />3,740 <br />SF <br />$ <br />$ <br />Exposed Aggregate Finish (T=6") <br />23.0 <br />86,020.00 <br />17 <br />Concrete Bus Pad <br />8,970 <br />SF <br />$ <br />$ <br />14.00 <br />125,580.00 <br />18 <br />Concrete Bus Pad — with Dowels <br />552 <br />SF <br />$ <br />$ <br />36.00 <br />19,872.00 <br />19 <br />PCC Protected Bike Lane (6") <br />805 <br />LF <br />$ <br />$ <br />32.00 <br />25,760.00 <br />20 <br />Adjust Manhole Frame and Cover to Finished <br />17 <br />EA <br />$ <br />$ <br />Grade <br />2,100.00 <br />35,700.00 <br />21 <br />Furnish and Install New Water Valve Frame <br />7 <br />EA <br />$ <br />$ <br />and Cover <br />2,800.00 <br />19,600.00 <br />22 <br />Furnish and Install Survey Monument to <br />1 <br />EA <br />$ <br />$ <br />Finished Grade <br />2,200.00 <br />2,200.00 <br />23 <br />Adjust Manhole Frame & Cover per OC San <br />2 <br />EA <br />$ <br />$ <br />Std. <br />4,300.00 <br />8,600.00 <br />24 <br />Traffic Signal Modification at Bristol St and <br />1 <br />LS <br />$ <br />$ <br />Wainer Ave <br />154, 000.00 <br />154, 000.00 <br />25 <br />Traffic Signal Modification at Bristol St and <br />1 <br />LS <br />$ <br />$ <br />Glenwood Pl. <br />418,000.00 <br />418,000.00 <br />26 <br />Traffic Signal Modification at Bristol St and <br />1 <br />LS <br />$ <br />$ <br />St. Andrew Pl. <br />167, 000.0167,000.00 <br />27 <br />Install 2" PVC Conduit per Plan <br />250 <br />LF <br />$ <br />$ <br />100.00 <br />25,000.00 <br />28 <br />Install 3" PVC Conduit per Plan <br />3,000 <br />LF <br />$ <br />$ <br />65.00 <br />195,000.00 <br />P-2 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.