My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:03:32 PM
Creation date
2/26/2025 9:36:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/4/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER <br />AVENUE TO SAINT ANDREW PLACE <br />PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />29 <br />Install 4" PVC Conduit per Plan <br />440 <br />LF <br />$ <br />$ <br />100.00 <br />44,000.00 <br />30 <br />Install No. 6 Pull Box <br />20 <br />EA <br />$ <br />$ <br />2,500.00 <br />50,000.00 <br />31 <br />Install No. 6E Pull Box <br />8 <br />EA <br />$ <br />$ <br />2,500.00 <br />20,000.00 <br />32 <br />Install SCE Pull Box <br />1 <br />EA <br />$ <br />$ <br />5,000.00 <br />5,000.00 <br />33 <br />Install Traffic Signal Loop Detector (Type E <br />12 <br />EA <br />$ <br />$ <br />Loop) <br />1,000.00 <br />12,000.00 <br />34 <br />Install CCTV & IP Communication System <br />1 <br />LS <br />$ <br />$ <br />35,000.00 <br />35,000.00 <br />35 <br />Install 144 Strand SMFO Cable <br />3,700 <br />LF <br />$ <br />$ <br />10.00 <br />37,000.00 <br />36 <br />Install 12 Strand SMFO Cable <br />200 <br />LF <br />$ <br />$ <br />10.00 <br />2,000.00 <br />37 <br />Fusion Splice 1 Strand of Single Mode Fiber <br />156 <br />EA <br />$ <br />$ <br />(SMFO) <br />100.00 <br />15,600.00 <br />38 <br />Install Fiber Optic Splice Closure <br />1 <br />EA <br />$ <br />$ <br />5,000.00 <br />5,000.00 <br />39 <br />Pothole Traffic Signal Pole Location for <br />12 <br />EA <br />$ <br />$ <br />Utility Conflicts <br />3,000.00 <br />36,000.00 <br />40 <br />Temporary Overhead Wiring at Traffic <br />1 <br />LS <br />$ <br />$ <br />Signals <br />45,000.00 <br />45,000.00 <br />41 <br />Street Lighting Installation <br />1 <br />LS <br />$ <br />$ 747,000.00 <br />747,000.00 <br />42 <br />8" PVC Class 305 (DR 14) C900 Pipe <br />1,300 <br />LF <br />$ <br />$ <br />350.00 <br />455,000.00 <br />43 <br />12" PVC Class 305 (DR 14) C900 Pipe <br />2,700 <br />LF <br />$ <br />$ <br />435.00 <br />1,174,500.00 <br />44 <br />1" Copper Water Service <br />14 <br />EA <br />$ <br />$ <br />7,000.00 <br />98,000.00 <br />45 <br />2" Copper Water Service <br />1 <br />EA <br />$ <br />$ <br />21,000.00 <br />21,000.00 <br />P-3 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.