Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER <br />AVENUE TO SAINT ANDREW PLACE <br />PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />63 <br />Trench Shoring & Plating <br />1 <br />LS <br />$ <br />$ <br />1,150,000.00 <br />1,150,000.00 <br />64 <br />18" RCP SD (2500-D) per City Standard Plan <br />310 <br />LF <br />$ <br />$ <br />1150 <br />700.00 <br />217,000.00 <br />65 <br />24" RCP SD (2500-D) per City Standard <br />40 <br />LF <br />$ <br />$ <br />Plan 1150 <br />1,000.00 <br />40,000.00 <br />66 <br />30" RCP SD (2500-D) per City Standard Plan <br />60 <br />LF <br />$ <br />$ <br />1150 <br />1,000.00 <br />60,000.00 <br />67 <br />48" RCP SD (1750-D) per City Standard Plan <br />2,520 <br />LF <br />$ <br />$ <br />1150 <br />925.00 <br />2,331,000.00 <br />68 <br />Reinforced Concrete Collar (D=18") per City <br />3 <br />EA <br />$ <br />$ <br />Standard Plan 320 <br />1,300.00 <br />3,900.00 <br />69 <br />Reinforced Concrete Collar (D=24") per City <br />1 <br />EA <br />$ <br />$ <br />Standard Plan 320 <br />1,300.00 <br />1,300.00 <br />70 <br />Junction Chamber Type 'B' per City Standard <br />12 <br />EA <br />$ <br />$ <br />Plan 307 <br />20,000.00 <br />240,000.00 <br />71 <br />Catch Basin Type 'B'(W=7') including Local <br />9 <br />EA <br />$ <br />$ <br />Depression per City Standard Plan 302 and <br />305 <br />16,000.00 <br />144,000.00 <br />72 <br />Catch Basin Type `B' (W=2F) including <br />2 <br />EA <br />$ <br />$ <br />Local Depression per City Standard Plan 303 <br />and 305 <br />28,000.00 <br />56,000.00 <br />73 <br />Concrete Pipe Support per SPPWC Standard <br />2 <br />EA <br />$ <br />$ <br />Plan 224-2 (Case I - 36" MWD) <br />4,000.00 <br />8,000.00 <br />74 <br />Wrap Proposed 18" Diameter Pipe with 24 <br />200 <br />LF <br />$ <br />$ <br />Mil Polyethylene Liner <br />200.00 <br />40,000.00 <br />75 <br />Abandon Existing 24" Storm Drain and <br />90 <br />LF <br />$ <br />$ <br />Backfill per STD 1212 <br />62.00 <br />5,580.00 <br />76 <br />Remove Existing 21" Storm Drain Line <br />20 <br />LF <br />$ <br />$ <br />300.00 <br />6,000.00 <br />77 <br />Remove Existing Manhole Structure and <br />2 <br />EA <br />$ <br />$ <br />Junction Box - Backfill per STD. 1150 <br />10,000.00 <br />20,000.00 <br />78 <br />Remove Existing 21'x3' Catch Basin <br />1 <br />EA <br />$ <br />$ <br />11,200.00 <br />11,200.00 <br />79 <br />Remove Existing 9'x4' Catch Basin <br />1 <br />EA <br />$ <br />$ <br />6,500.00 <br />6,500.00 <br />80 <br />Transition Structure <br />2 <br />EA <br />$ <br />$ <br />44,000.00 <br />88,000.00 <br />P-5 of P-23 <br />