My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:03:32 PM
Creation date
2/26/2025 9:36:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/4/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER <br />AVENUE TO SAINT ANDREW PLACE <br />PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />63 <br />Trench Shoring & Plating <br />1 <br />LS <br />$ <br />$ <br />1,150,000.00 <br />1,150,000.00 <br />64 <br />18" RCP SD (2500-D) per City Standard Plan <br />310 <br />LF <br />$ <br />$ <br />1150 <br />700.00 <br />217,000.00 <br />65 <br />24" RCP SD (2500-D) per City Standard <br />40 <br />LF <br />$ <br />$ <br />Plan 1150 <br />1,000.00 <br />40,000.00 <br />66 <br />30" RCP SD (2500-D) per City Standard Plan <br />60 <br />LF <br />$ <br />$ <br />1150 <br />1,000.00 <br />60,000.00 <br />67 <br />48" RCP SD (1750-D) per City Standard Plan <br />2,520 <br />LF <br />$ <br />$ <br />1150 <br />925.00 <br />2,331,000.00 <br />68 <br />Reinforced Concrete Collar (D=18") per City <br />3 <br />EA <br />$ <br />$ <br />Standard Plan 320 <br />1,300.00 <br />3,900.00 <br />69 <br />Reinforced Concrete Collar (D=24") per City <br />1 <br />EA <br />$ <br />$ <br />Standard Plan 320 <br />1,300.00 <br />1,300.00 <br />70 <br />Junction Chamber Type 'B' per City Standard <br />12 <br />EA <br />$ <br />$ <br />Plan 307 <br />20,000.00 <br />240,000.00 <br />71 <br />Catch Basin Type 'B'(W=7') including Local <br />9 <br />EA <br />$ <br />$ <br />Depression per City Standard Plan 302 and <br />305 <br />16,000.00 <br />144,000.00 <br />72 <br />Catch Basin Type `B' (W=2F) including <br />2 <br />EA <br />$ <br />$ <br />Local Depression per City Standard Plan 303 <br />and 305 <br />28,000.00 <br />56,000.00 <br />73 <br />Concrete Pipe Support per SPPWC Standard <br />2 <br />EA <br />$ <br />$ <br />Plan 224-2 (Case I - 36" MWD) <br />4,000.00 <br />8,000.00 <br />74 <br />Wrap Proposed 18" Diameter Pipe with 24 <br />200 <br />LF <br />$ <br />$ <br />Mil Polyethylene Liner <br />200.00 <br />40,000.00 <br />75 <br />Abandon Existing 24" Storm Drain and <br />90 <br />LF <br />$ <br />$ <br />Backfill per STD 1212 <br />62.00 <br />5,580.00 <br />76 <br />Remove Existing 21" Storm Drain Line <br />20 <br />LF <br />$ <br />$ <br />300.00 <br />6,000.00 <br />77 <br />Remove Existing Manhole Structure and <br />2 <br />EA <br />$ <br />$ <br />Junction Box - Backfill per STD. 1150 <br />10,000.00 <br />20,000.00 <br />78 <br />Remove Existing 21'x3' Catch Basin <br />1 <br />EA <br />$ <br />$ <br />11,200.00 <br />11,200.00 <br />79 <br />Remove Existing 9'x4' Catch Basin <br />1 <br />EA <br />$ <br />$ <br />6,500.00 <br />6,500.00 <br />80 <br />Transition Structure <br />2 <br />EA <br />$ <br />$ <br />44,000.00 <br />88,000.00 <br />P-5 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.