My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:03:32 PM
Creation date
2/26/2025 9:36:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/4/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER <br />AVENUE TO SAINT ANDREW PLACE <br />PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />46 <br />6" Fire Service <br />1 <br />EA <br />$ <br />$ <br />48,000.00 <br />48,000.00 <br />47 <br />Fire Hydrant <br />11 <br />EA <br />$ <br />$ <br />24,000.00 <br />264,000.00 <br />48 <br />8" Resilient Wedge Gate Valve <br />12 <br />EA <br />$ <br />$ <br />4,500.00 <br />54,000.00 <br />49 <br />12" Resilient Wedge Gate Valve <br />7 <br />EA <br />$ <br />$ <br />6,700.00 <br />46,900.00 <br />50 <br />Steel Casing <br />150 <br />LF <br />$ <br />$ <br />310.00 <br />46,500.00 <br />51 <br />Abandon Existing Water Service <br />30 <br />EA <br />$ <br />$ <br />310.00 <br />9,300.00 <br />52 <br />Abandon Existing Fire Service <br />1 <br />EA <br />$ <br />$ <br />2,500.00 <br />2,500.00 <br />53 <br />Abandon Existing Sewer Lateral <br />34 <br />EA <br />$ <br />$ <br />2,600.00 <br />88,400.00 <br />54 <br />CCTV Inspection of Existing Sewer Main <br />6,000 <br />LF <br />$ <br />$ <br />5.00 <br />30,000.00 <br />55 <br />CCTV Inspection of Existing Sewer Laterals <br />40 <br />EA <br />$ <br />$ <br />1,300.00 <br />52,000.00 <br />56 <br />Vertical Offset Type I (As -Needed)* <br />4 <br />EA <br />$ <br />$ <br />7,700.00 <br />30,800.00 <br />57 <br />Vertical Offset Type 2 <br />3 <br />EA <br />$ <br />$ <br />18,400.00 <br />55,200.00 <br />58 <br />Additional Potholing (As -Needed)* <br />13 <br />EA <br />$ <br />$ <br />2,300.00 <br />29,900.00 <br />59 <br />8' High Sound Wall (including footing) <br />2,750 <br />LF <br />$ <br />$ <br />438.00 <br />1,204,500.00 <br />60 <br />Ornamental Wall (including footing) <br />500 <br />LF <br />$ <br />$ <br />1,000.00 <br />500,000.00 <br />61 <br />2222 S. Bristol St. - Wall Reconstruction <br />1 <br />LS <br />$ <br />$ <br />7,500.00 <br />7,500 <br />62 <br />1306 W. Saint Anne Pl. -Wall <br />1 <br />LS <br />$ <br />$ <br />Reconstruction <br />7,500.00 <br />7,500.00 <br />P-4 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.