My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
119, (27) <br /> <br />120. (28) <br /> <br />121. (29) <br /> <br />Carefully worded signing shall mark the guest entry and explain that a token must be <br />used for exit. The tenant shall give their guest a token to exit the guest parking via a <br />token machine and barrier gate. This will place all guest cars in the secure area to <br />guard against auto theft. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to operation; plan check <br /> <br />Method of Verification. <br /> <br />Inspection; sign program; plan <br />check <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division; Case Planner, Planning <br />Division; Building Division <br /> <br />The exit to Owens Drive shall have a sequencer that will meter the lanes so that only <br />one car can exit at a time. This will allow existing traffic to merge prior to entering <br />the Owens traffic flow. <br /> <br />Timing of Imnlementation/Verificafion <br /> <br />Prior to operation of Phase II <br /> <br />Method of Verification <br /> <br />Inspection/Parking Operations <br />Plan <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division; and Supervisor of <br />Inspections, Building Division <br /> <br />The overnight hotel guest parking area shall occupy a fenced portion of sublevel 2. <br />It is anticipated that hotel guests shall use valet parking. Rolling security gates, <br />clicker controlled, will be activated by the valet attendant. This area shall have <br />increased lighting and may have additional security measures if it is determined that <br />the fencing and secure access is not satisfactory. Closed-circuit television coverage is <br />planned. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to operation of Phase 11 <br /> <br />Method of Verification <br /> <br />Inspection/Operations Plan <br /> <br />Responsible Parties <br /> <br />Property Manager; Police; <br />Supervisor of Inspections, <br />Building Division; and Case <br />Planner, Planning Division <br /> <br />JB3/S:11340001 .MM A-52 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.