My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
117. (25) <br /> <br />118. (26) <br /> <br />Per the Operation Plan and the City of Santa Ana, the Concourse Road, which carries <br />traffic from Owens Drive to the Main Street intersection, will be restricted by bollards <br />at two points. The first set of bollards will force all traffic to drive into the loop to <br />access valet parking. The second point will prevent all traffic from continuing on to <br />the Main Street intersection. All traffic coming out of the loop will be required to turn <br />left to the Owens exit from Main Street Concourse. <br /> <br />Timing of Implementation/Verification <br /> <br />Plan check <br /> <br />Method of Verification <br /> <br />Review; CC&Rs; Inspection <br /> <br />Responsible Parties <br /> <br />Senior Plan Check Engineer, <br />Building Division; and Case <br />Planner, Planning Division; <br />Engineering Services Manager; <br />applicant responsible for <br />bollarding <br /> <br />Two valet operations shall be located at the semi-circular driveway on the east side of <br />the Grand Roadway between the Phase I office tower and the hotel. This driveway <br />will be one-way traffic, entering off the Concourse in front of the hotel and following <br />the semi-circular driveway to the following stations or features: <br /> <br />· Hotel valet station <br />· Valet only entry/exit ramp to sublevel 1 <br />· Valet station for office/restaurant <br />· Stop sign at exit of Valet loop <br /> <br />Timing of Implementation/Verification <br /> <br />Plan check <br /> <br />Review; CC&Rs <br /> <br />Property Manager, Senior Plan <br />Check Engineer, Building <br />Division; and Case Planner, <br />Planning Division; Engineering <br />Services Manager, Development <br />Engineering Division <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />JB3/S:11340001 .MM A-51 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.