My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
390 <br /> <br />PUBLIC SERVICES <br /> <br />FIRE PROTECTION <br /> <br />124. (1) <br /> <br />Prior to the certification of occupancy, the applicant shall pay the required fire facilities <br />fees and shall complete required fire inspections throughout project construction. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsibl~ Parties <br /> <br />125. (2) <br /> <br />126. (3) <br /> <br />Prior to certificate of occupancy <br />issuance for Phase I <br /> <br /> Written memo with copy of <br />· canceled check <br /> <br />Fire Department, project <br />applicant <br /> <br />The project shall comply with all Fire Department requirements regarding project <br />design and construction, including the Standard Requirements for New High Rise <br />Buildings. Project design features that will help to reduce the impact on fire protection <br />services that have been incorporated into the proposed project include the following: <br /> <br />· Automatic fire sprinklers and stand-pipes. <br />· Smoke detectors and alarm systems. <br />· Smoke management system. <br />· High rise life safety systems <br />· Emergency helicopter landing pad on high rise roof. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check <br /> <br />Review <br /> <br />Senior Plan Check Engineer, <br />Building Division; and Fire <br />Department <br /> <br />Fire access lanes shall be posted "no stopping/fire lane" and restricted to fire apparatus <br />only and shall not be used to meet other parking, loading, or staging needs. <br /> <br />Timing of Implementation/Verification <br /> <br />Plan check; construction <br /> <br />Method of Verification <br /> <br />Review and inspection <br /> <br />Responsible Parties <br /> <br />Senior Plan Check Engineer and <br />Supervisor of Inspections, <br />Building Division; and Fire <br />Department <br /> <br />JB3/S:11340001 .MM A-54 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.