Laserfiche WebLink
391 <br /> <br />127. (4) <br /> <br />128. (5) <br /> <br />129. (6) <br /> <br />Mechanical smoke removal system shall be provided in all subterrgnean parking <br /> <br />structures and high-rise buildings. <br />Timin~ of Imolementation/Verifigation <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check; construction <br />Review and inspection <br /> <br />Senior Plan Check Engineer and <br />Supervisor of Inspections, <br />Building Division; and Fire <br />Department <br /> <br />All buildings in excess of 14 stories shall be provided with an emergency helicopter <br />pad. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Annual emergency drills shall be conducted and <br />Department to maintain emergency preparedness at <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check; construction <br />Review and inspection <br /> <br />Supervisor of Inspections and <br />Senior Plan Check Engineer, <br />Building Division, Case Planner, <br />Planning Division, Fire <br />Department <br /> <br />may be supervised by the Fire <br />all times. <br /> <br />Annually <br /> <br />Report initialed by Fire <br />Department <br /> <br />Planning Division; Fire <br />Department <br /> <br />JB3/S:I 1340001 .MM A-55 <br /> <br /> <br />