Laserfiche WebLink
393 <br /> <br />132. (2) <br /> <br />133. (3) <br /> <br />134. (4) <br /> <br />35. (5) <br /> <br />All main entry ways to the residential units ghall be properly illuminated. <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check; construction <br /> <br />Review and inspection <br /> <br />Case Planner, Planning Division; Police <br />Department; Supervisor of Inspections and <br />Senior Plan Check Engineer, Building Division <br /> <br />The Security Plan submitted to, and approved by, the police department shall be <br />adhered to. A copy of the plan is provided in Appendix K of the RDEIR. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check; periodic operation <br />inspection after certificate of <br />occupancy <br /> <br />Review and inspection <br /> <br />Police Department; <br />Environmental Consultant <br /> <br />The Santa Aha Police Department will be involved with the planning process at the <br /> <br />earliest stages. <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check <br /> <br />Review <br /> <br />Case Planner, Planning Division; <br />Police Department <br /> <br />Glass store fronts with open visibility shall be used thronghout the project in all pedes- <br /> <br />trian corridor areas. <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check <br /> <br />Review <br /> <br />Case Planner, Planning Division; <br />Police Department <br /> <br />JB3/S:11340001 .MM A-57 <br /> <br /> <br />