My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
392 <br /> <br />130. <br /> <br />The applicant shall provide a minimum of one Deputy Fire Inspector, approved by the <br />City of Santa Aha Fire Department, as an onsite Fire Inspector for construction phase <br />of the project. Such inspector shall be available from the beginning of construction of <br />the first building through final sign-off on the last shell structure for the last tenant <br />improvement space, and the applicant shall provide the funds to cover the cost of: <br /> <br />· Fire facilities fees based on square footage. <br /> <br />One-half of the cost of a Fire Safety Analyst for the period beginning with the <br />first building plant submittal and extending through the last Certificate of <br />Occupancy issued on last tenant improvement space. <br /> <br />One-half of the cost of a Fire Safety Specialist for the time of the first fire <br />inspection through last Certificate of Occupancy issued on the last tenant <br />improvement space. <br /> <br />· Man days each year for a fire inspector based on the following schedule: <br /> <br />Stories Inspector Days <br /> <br />1-5 1 <br />6-10 2 <br />11-15 3 <br />16-20 4 <br />21-25 5 <br />26-30 6 <br />31-35 7 <br /> <br />Timing of Implementation <br /> <br />Concurrent with issuance of Phase I building <br />permit <br /> <br />Method of Verification <br /> <br />Field inspection and written verification from <br />project applicant <br /> <br />Responsible Parties <br /> <br />Fire Department; Case Planner; Project <br />Applicant <br /> <br />POLICE PROTECTION <br /> <br />131. (I) Street and project lighting shall be provided per Santa Ana Police Department, and <br /> Planning and Public Works Agency standards. <br /> <br />Timing of Implementation/Verification Plan cheek; construction <br /> <br />Method of Verification <br /> <br />Review and inspection <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager, Development <br />Engineering Division; Case Planner, Planning <br />Division; Police Department; Sul)ervisor of <br />Inspections and Senior Plan Check Engineer, <br />Building Division. <br /> <br />IB3/S:1134000l .MM A-56 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.