My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
149. <br /> <br />WASTEWATER <br />150. (2) <br /> <br />t5 . (3) <br /> <br />When available, the Main Street Concourse project shall utilize reclaimed water for <br />onsite project landscaping. <br /> <br />Timing of Implementation/Verificgtion <br /> <br />Method of Verification <br /> <br />Resp0ns ble Parties <br /> <br />Plan check; during construction <br />Review and inspection <br /> <br />Environmental Coordinator, <br />Planning Division; Engineering <br />Services Manager, Development <br />Engineering Division; Water <br />Resources Manager, Public <br />Works Agency <br /> <br />Water conserving and low-flow fixtures shall be installed as provided for by existing <br />statutes and building and water codes. <br /> <br />Timing of Implementation/Verification <br /> <br />Plan check; construction <br /> <br />Method of Verifica, tion <br /> <br />Review and inspection <br /> <br />Responsible Parties <br /> <br />Supervisor of Inspections and <br />Senior Plan Check Engineer, <br />Building Division <br /> <br />Orange County Sanitation Districts (OCSD) is planning for the construction of a <br />Memory Lane sewer interceptor that will relieve regional sewer capacity needs. The <br />sewer will be a joint venture between the OCSD, City of Santa Ana, and City of <br />Orange. The interceptor is planned to be in place by December 1992, prior to the <br />development of the project. The applicant shall pay a fair share contribution for these <br />sewer improvements no later than May 8, 1992, or 7 days after entitlement is granted, <br />whichever occurs first. <br /> <br />Timing of Imnlementation/Verification <br /> <br />As stipulated <br /> <br />Method of Verification <br /> <br />Written memo and copy of <br />canceled check <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, <br />Planning Division; Engineering <br />Services Manager, Development <br />Engineering Division <br /> <br />401 <br /> <br />JB3/S:I 1340001 .MM A-65 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.