Laserfiche WebLink
35O <br /> <br />28. (7) <br /> <br />The existing parkway drain shall be intercepted at the northeast corner of the Main <br />Street Concourse and the storm water conveyed from the proposed intersection as part <br />of the drainage system. <br /> <br />Timing of Implementation <br /> <br />Prior to Phase I Certificate of <br />Occupancy <br /> <br />Method of Verification <br /> <br />Surface drainage plan <br />check/grading plan check and <br />field inspection <br /> <br />Resoonsible Parties <br /> <br />Inspection Services Manager, <br />Building Division; and <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />l B3/S: I 1340001 .MM A- 14 <br /> <br /> <br />