My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lawson Way at Town and Country Road <br /> <br />67. (9) In order to mitigate the impacts to the intersection of Lawson Way at Town and <br /> Country Road, the following Phase I improvements are necessary. <br /> <br /> a. Stripe the eastbound approach for dual left-turn lanes, two through lanes, and two <br /> receiving lanes. <br /> <br /> b. Stripe the northbound approach for one left-turn lane, two through lanes, and <br /> <br /> two receiving lanes. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br />Responsible Parties <br /> <br />Other Required Mitigation Measures <br /> <br />Prior to Phase I Certificate of <br />Occupancy <br /> <br />Written verification/inspection <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division; Cities of Santa Ana and <br />Orange <br /> <br />The following measures (MMPs 68-74) must be satisfied in time to allow for the widening of Owens <br /> <br />Drive by May 1993: <br /> <br />68. (10) Dedicate Owens Drive per City-approved Street Channelization Plan. <br /> <br />Timing of Implementation/Verification <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />By May 1993 <br /> <br />Copy of recorded <br />dedicate <br /> <br />69. (10) <br /> <br />offer to <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />Dedicate Main Street per City-approved Street Channelization Plan. <br /> <br />Timing of Implementation/Verification By May 1993 <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Copy of recorded offer to <br />dedicate <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />Ul3/S:I 1340001 .MM A-32 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.