My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
63. (6) <br /> <br />64. (7) <br /> <br />65. (8) <br /> <br />66. <br /> <br />Modify the signal at Main Street and Owens Drive to accommodate the proposed <br /> <br />improvements. <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Prior to May 1993 <br /> <br />Inspection and acceptance <br /> <br />ExecutiveDirector, PublicWorks <br />Agency <br /> <br />Install a traffic signal at the proposed intersection of Owens Drive and Lawson Way. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Prior to May 1993 <br /> <br />Inspection and acceptance <br /> <br />Executive Director, Public Works <br />Agency <br /> <br />Install a traffic signal at the proposed intersection of Owens Drive and the project <br />driveway. This will change the circulation pattern on the Lincoln Property site on the <br />south side of Owens Drive. The fourth leg of this intersection will be the second <br />access drive to the Lincoln Property site, providing the site with fl.,Il signalization <br />access opportunity. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of Phase 1 <br />Certificate of Occupancy <br /> <br />Method of Verification <br /> <br />Inspection and acceptance <br /> <br />Responsible Parties <br /> <br />Executive Director, Public Works <br />Agency <br /> <br />Prior to constructing a traffic signal at Owens Drive and the project driveway, the <br />applicant shall pay for and secure approval to bnild onsite modifications (e.g., <br />landscaping, driveway modifications, and utility pole relocations) to Lincoln Properties <br />in order to reduce impacts associated with signalization. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of Phase <br />Certificate of Occupancy <br /> <br />Method of Verification <br /> <br />Written approval from Lincoln <br />Properties, inspection, and <br />acceptance <br /> <br />Responsible Parties <br /> <br />Executive Director, Pablic Works <br />Agency <br /> <br />367 <br /> <br />/B3/S:11340001 .MM A-31 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.