My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
373 <br /> <br />Phase II Mitigation Measures <br /> <br />Owens Drive Improvements <br /> <br />82. (16) The applicant shall contribute its fair-share of funds for the completion of the Owens <br /> Drive ultimate street improvements from the eastern City limit to Broadway. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Main Street Improvements <br />~. (17) <br /> <br />Prior to Phase II Building Permit <br />Inspection <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />Restripe Main Street Concourse exit to provide dual westbound left-turn lanes and <br /> <br />modify signal operation. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Lawson Way Improvetnents <br /> <br />Prior to Phase Il Certificate of <br />Occupancy <br /> <br />Inspection <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />84. (18) <br /> <br />The applicant shall stripe Lawson Way for four lanes and a two-way left-turn lane from <br />Owens Drive to Town and Country Road. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of first Building <br />Permit of Phase I1 <br /> <br />Method of Verification <br /> <br />Inspection/coordinated with the <br />City of Orange <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager; <br />Development Engineering <br />Division; Cities of Santa Ann and <br />Orange <br /> <br />.~B3/S:11340001 .MM A-37 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.