My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:59 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-21
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 94-021 <br /> <br />AIR QUALITY <br /> <br />Prior to the submittal of applications for grading permits, <br />future applicants shall submit a report to the Planning and <br />Building Agency and Public Works Agency, demonstrating <br />compliance of the proposed grading with City policies and <br />conditions regarding local adherence to South Coast Air <br />Quality Management District Rules 402 and 403. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior Issuance of Grading <br />Permits <br /> <br />- Metho4 of Monitoring: <br /> <br />Plan Check and Review and <br />Field Inspection <br /> <br />- Monitoring Agency: <br /> <br />Construction equipment shall <br />emission control devices and be kept <br />minimize construction vehicle emissions. <br />be monitored by the contractor and is <br />inspection by city staff. <br /> <br /> Environmental Coordinator <br /> and Supervisor of <br /> Inspections, city <br /> Planning and Building <br /> Agency <br /> <br />be fitted with the most modern <br />in proper tune to <br /> This measure shall <br /> subject to periodic <br /> <br />- Responsible for Implementation: Future Applicants <br /> /Contractors <br /> <br />- Monitoring Phase: <br /> <br />Throughout Construction <br /> <br />- Method of Monitoring: <br /> <br />Site-Inspection <br /> <br />- Monitoring Agency: <br /> <br />Environmental Coordinator <br />and Supervisor of <br />Inspections, city <br />Planning and Building <br />Agency <br /> <br />Stationary source emissions shall be reduced through energy <br />efficient design practices as required by Title 24 of the <br />State Administrative Code. The City shall review future <br />proposals on a project-by-project basis to ensure compliance. <br /> <br />- Responsible for Implementation: <br /> <br />Future <br />Planning <br />Agency <br /> <br />Applicants/City <br />and Building <br /> <br />3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.