My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:59 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-21
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 94-021 4.03 <br /> <br />20. <br /> <br />21. <br /> <br />22. <br /> <br />23. <br /> <br />- Monitoring Agency: <br /> <br />City Planning <br />Building Agency <br /> <br />and <br /> <br />Stationary equipment shall be placed such that emitted noise <br />is directed away from sensitive noise receivers such as <br />residential areas. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Building Permit <br /> <br />- Method of Monitoring: <br /> <br />Site Inspection <br /> <br />- Monitoring Agency: <br /> <br />Inspection Services <br />Manager, City Planning <br />and Building Agency <br /> <br />Stockpiling and vehicle staging areas shall be located as far <br />as practical from occupied dwellings. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Throughout Construction <br /> <br />- Method of Monitoring: <br /> <br />Site Inspection <br /> <br />- Monitoring Agency: <br /> <br />Inspection Services <br />Manager, city Planning <br />and Building Agency <br /> <br />The City shall review future development proposals on a <br />project-by-project basis to ensure that the greatest distance <br />between noise sources and receptors would be provided. <br /> <br />- Responsible for Implementation: Planning <br /> Agency <br /> <br />and Building <br /> <br />- Monitoring Phase: <br /> <br />Prior to Site Plan <br />Approval of Future Plans <br /> <br />- Method of Monitoring: <br /> <br />Plan Check and Review <br /> <br />- Monitoring Agency: <br /> <br />Case Planner and <br />Environmental <br />Coordinator, City <br />Planning and Building <br />Agency <br /> <br />Any residential barriers that are removed in conjunction with <br />the plan shall be replaced with sound attenuating barriers of <br />at least six feet in height. <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.