My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:59 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-21
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
402 RESOLUTION 94-021 <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />- Method of Monitoring: <br /> <br />Site Inspection <br /> <br />- Monitoring Agency: <br /> <br />Environmental <br />Coordinator, City <br />Planning and Building <br />Agency <br /> <br />Noise studies shall be required for any residential units <br />proposed within the 65 Ldn contour. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Building Permits <br /> <br />- Method of Monitoring: <br /> <br />Plan Check and Review <br /> <br />- Monitoring Agency: <br /> <br />Environmental Coordinator <br />and Senior Plan Check <br />Engineer, City Planning <br />and Building Agency <br /> <br />To the greatest extent feasible, construction activities shall <br />be screened from adjacent noise-sensitive land uses with <br />fencing. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior <br />Grading <br />Permit <br /> <br />to Issuance of <br />and Construction <br /> <br />- Method of Monitoring: <br /> <br />Grading Plan Check and <br />Site Inspection <br /> <br />- Monitoring Agency: <br /> <br />Environmental <br />Coordinator, City <br />Planning and Building <br />Agency <br /> <br />Ail construction equipment, fixed or mobile, operated within <br />1,000 feet of a dwelling unit shall be equipped with properly <br />operating and maintained muffler exhaust systems. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Grading Permit <br /> <br />- Method of Monitoring: <br /> <br />Site Inspection <br /> <br />9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.