Laserfiche WebLink
402 RESOLUTION 94-021 <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />- Method of Monitoring: <br /> <br />Site Inspection <br /> <br />- Monitoring Agency: <br /> <br />Environmental <br />Coordinator, City <br />Planning and Building <br />Agency <br /> <br />Noise studies shall be required for any residential units <br />proposed within the 65 Ldn contour. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Building Permits <br /> <br />- Method of Monitoring: <br /> <br />Plan Check and Review <br /> <br />- Monitoring Agency: <br /> <br />Environmental Coordinator <br />and Senior Plan Check <br />Engineer, City Planning <br />and Building Agency <br /> <br />To the greatest extent feasible, construction activities shall <br />be screened from adjacent noise-sensitive land uses with <br />fencing. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior <br />Grading <br />Permit <br /> <br />to Issuance of <br />and Construction <br /> <br />- Method of Monitoring: <br /> <br />Grading Plan Check and <br />Site Inspection <br /> <br />- Monitoring Agency: <br /> <br />Environmental <br />Coordinator, City <br />Planning and Building <br />Agency <br /> <br />Ail construction equipment, fixed or mobile, operated within <br />1,000 feet of a dwelling unit shall be equipped with properly <br />operating and maintained muffler exhaust systems. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Grading Permit <br /> <br />- Method of Monitoring: <br /> <br />Site Inspection <br /> <br />9 <br /> <br /> <br />