My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:59 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-21
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4O8 <br /> <br />RESOLUTION 94-021 <br /> <br />- Method of Monitoring: <br /> <br />- Monitoring Agency: <br /> <br />Plan Check and Review <br /> <br />Case Planner, City <br />Planning and Building <br />Agency <br /> <br />LIGHT AND GLARE <br /> <br />33. <br /> <br />34. <br /> <br />The City shall utilize the following guidelines and standards <br />contained in the Specific Plan relating to lighting in its <br />review of future redevelopment proposals: <br /> <br />Light fixtures shall be integrated into the overall <br />building design. <br /> <br />b. Parking lot fixtures shall be 20 to 25 feet high. <br /> <br />Ce <br /> <br />Ail exterior lighting shall be adequately controlled and <br />shielded to prevent glare and undesirable illumination of <br />adjacent properties and streets, per the approval of the <br />City Engineer. <br /> <br />High intensity security lighting fixtures shall not be <br />substituted for site landscape lighting or general <br />building exterior illumination. Such lighting shall be <br />limited to loading and storage locations, or to similar <br />service areas only. <br /> <br />- Responsible <br /> <br />for Implementation: <br /> <br />City Planning and <br />Building Agency/ <br />Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Building Permits <br /> <br />- Method of Monitoring: <br /> <br />Plan Check and <br />Review and Site <br />Inspection <br /> <br />- Monitoring Agency: <br /> <br />Case Planner and <br />Environmental <br />Coordinator, City <br />Planning and <br />Building Agency <br /> <br />The Planning and Building Agency shall review all future <br />proposals on a project-by-project basis and ensure that said <br />proposal is in conformance with the lighting standards and <br /> <br />15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.