My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 94-023 <br /> <br />Manager, DevelopmentEngineering <br />Division <br /> <br />15. Modification of traffic signal at Tusfin and Bentall driveway. <br /> <br />Tilnine of lmolementation/Vefification <br /> <br />Prior to Certificate of Occupancy <br />issuance <br /> <br />Method of Verification <br /> <br />Field inspection <br /> <br />l~esoonsible Parties <br /> <br />Environmental Coordinaton Planning <br />Division; Engineering Services <br />Manager, Development Engineering <br />Division <br /> <br />16. Acquire easement from adjacent property owner on Tusfin immediately south of the project <br /> for modifications/alignment at Tustin and the Bentall driveway. <br /> <br />Timin~ of Imnlementation/Vefification <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification <br /> <br />Grading and off-site improvement <br />plan check <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Planning <br />Division; Engineering Services <br />Manager, Development Engineering <br />Division <br /> <br />17. <br /> <br />The project sponsor shall implement a Transportation Demand Mahagement Program <br />(TDMP) included in Appendix C of the Traffic Analysis through the CC&Rs on the project. <br />The TDMP shall (1) set a performance standard of a 15% reduction in trips otherwise <br />anticipated, (2) require annual monitoring of traffic as compared to the standard, (3) contain <br />a broad range of secondary TDM strategies to further reduce traffic, and (4) require that the <br />project owners either pay a TDM penalty fee or implement the secondary strategies until the <br />standard is met. <br /> <br />Timine of lmolementation/Vefification <br /> <br />Condition of Certificate of <br />Occupancy; on-going during life of <br />project <br /> <br />Method of Verification <br /> <br />Written report to be provided by the <br />project sponsor or representative <br />annually; recorded TDMP in project's <br />CC&Rs <br /> <br />Responsible Parlies <br /> <br /> Engineering Services Manager, <br />Development Engineering <br />Division; Public Works Agency; <br />Project Sponsor or representative <br /> <br />-8- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.