Laserfiche WebLink
482 RESOLUTION 94-023 <br /> <br />18. Participation in TSIA a~a-wide fee programs. <br /> <br />Timin¢, of Implementation/Verification <br /> <br />Prior to issuance to building permits <br /> <br />Written verification of canceled <br />checks <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager, <br />Development Engineering Division; <br />Public Works Agency <br /> <br />Bus Transit <br /> <br />19. Construct eastbound bus turnout, a minimum of 70 feet in length, with transition m existing <br /> improvements on 17th to Tustin. <br /> <br />Timing, of Implementation/Verification <br /> <br />Prior to Certificate of Occupancy <br />issuance <br /> <br />Method of Verification <br /> <br />Grading and off-site improvement <br />plan check; field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Planning <br />Division; Engineering Services <br />Manager, Development Engineering <br />Division <br /> <br />20. Construct southbound bus turnout, a minimum of 60 feet in length, with transition to <br /> existing improvements on Tustin to 17th. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to Certificate of Occupancy <br />issuance <br /> <br />Method of Verification <br /> <br />Grading and off-site improvement <br />plan check; field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coordinaton Planning <br />Division; Engineering Services <br />Manager, Development Engineering <br />Division <br /> <br /> <br />