Laserfiche WebLink
485 <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />Method of Verification <br /> <br />Grading plan check; periodic field <br />inspection during grading <br />operations <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, plammng <br />Division; Inspection Services <br />Supervisor. Building Division <br /> <br />Construction activities shall be phased and scheduled [o avoid emission peaks and shall be <br />discontinued during second-stage smog alerts. <br /> <br />Timing of Imnlementation/Vefification <br /> <br />During grading and construction <br /> <br />Method of Verification <br /> <br />Grading plan check and field <br />inspection <br /> <br />Res_t~nsible Parties <br /> <br />Environmental Coordinator, <br />Planning Division; Inspection <br />Services Supervisor. Building <br />Division <br /> <br />Prior to the issuance of Certificate of Occupancy of Smith's Superstore, until construction <br />on those pads commences, to minimize dust generations, any of building pads A, B, D-H. J <br />or L not under construction, in Building Depamment Plan Check or it can be shown to the <br />satisfaction of the City that Plan Check is imminent, then said building pads areas shall be <br />provided with interim landscaping, as follows: Building D-H, wildllower mix: Buildings A, <br />B, J, L, planted with tuff grass. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of Certificate of <br />Occupancy for Smiths; and on-going <br />during construction <br /> <br />Methg0 9f Verification <br /> <br />Grading. architectural, and <br />landscaping plan check; periodic field <br />inspections during grading <br />operations <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner and Landscape Associate, <br />Planning Division: Inspection <br />Services Supervisor. Building <br />Division <br /> <br />Wheel washers shall be installed where vehicles exit unpaved roads onto paved roads or <br />wash off trucks and any equipment leaving the site before every trip: <br /> <br />Timing of tmglementation/Vefi fication <br /> <br />Condition of grading permit <br />issuance (note on grading plan) <br /> <br />-12- <br /> <br /> <br />