Laserfiche WebLink
24. In addition to project specific mitigation measures listed above, the project sponsor shall <br /> participate in the TSIA area wide tramc fee programs. <br /> <br />Timine of ImolementationPv'erification <br />Method of Verification <br /> <br />p. esponsible Parties <br /> <br />AIR QUALITY <br /> <br />Short-Term Project Construction <br /> <br />25. <br /> <br />Prior t~ issuance of building permits <br /> <br />Written verification of canceled <br />checks <br /> <br />Engineering Services Manager, <br />Development Engineering Division; <br />Public Works Agency <br /> <br />All unpaved demolition and construction areas shall be wetted at least twice a day during <br />excavation and construction, and temporary dust covers shall be used on soil piles to reduce <br />dust emissions and meet SCAQMD Rule 403. <br /> <br />Timing of Implementation/Verification <br />Method of Verification <br /> <br />Resnonsible Parties <br /> <br />During grading and consWaction <br /> <br />Periodic field inspection during <br />grading and construction <br /> <br />Environmental Coordinaton Planning <br />Division; Inspections Services <br />Manager, Building Division <br /> <br />26. All grading activities shall cease during periods of high winds (i.e. greater than 25 knots). <br /> <br />Timine of lmt)lementation/Verification <br /> <br /> V riff <br />Responsible Parties <br /> <br />Conditions of grading permit; <br />wind speed gauge with warning <br />light; grading contractor <br /> <br />Grading plan check; field inspection <br /> <br />Environmental Coordinator, Planning <br />Division; Inspection Services <br />Manager, Building Division <br /> <br />General contractors shall maintain and operate construction equipment so as to minimize <br />exhaust emissions. During construction, trucks and vehicles in loading and unloading <br />queues shall be kept with their engines off. when not in use, to reduce vehicle emissions. <br /> <br />Timing of Implementation/Verification During grading/construction <br /> operations <br /> -11- <br /> <br /> <br />