My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 94-023 48~ <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner. Planning Division; <br />Inspection Services Manager, <br />Building Division <br /> <br />38. A wall profile shall be provided to the City for review and approval prior to site plan <br /> approval. <br /> <br />Timine of Implementation/Verification <br /> <br />Prior to site plan approval <br /> <br />Site plan check <br /> <br />Rest~onsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner, Planning Division; Senior <br />Plan Check Engineer, Building <br />Division <br /> <br />39. <br /> <br />Prior to the issuance of a grading permit, the applicant shall erect one of the following: a) a <br />temporary plywood fence or b) a permanent wail, along the entire length of the south <br />property line in order to reduce short-term noise and dust impacts. Subject to final grading <br />plans, the temporary fence or permanent wall shall be a minimum of eight feet on the <br />project side and a maximum often feet on the adjacent property to the south. The <br />temporary fence (if consU'ucted) shall stay in place until the grading and construction of <br />Smith's is complete or the permanent wall construction has commenced. <br /> <br />Timin~ of Implementation/Verification <br /> <br />Prior to issuance of grading permit, <br />building permits, Certificate of <br />Occupancy <br /> <br />Method of Verification <br /> <br />Architectural, building and grading <br />plan check, field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner, Planning Division; <br />Inspection Services Manager, <br />Building Division <br /> <br />Long Term Project Ot~eration <br /> <br />40. <br /> <br />If the plywood fence is constructed, within 48 hours of removal of the fence and prior to the <br />issuance of a certificate of occupancy for Smith's, the applicant shall begin construction of a <br />new contiguous concrete block wall for the entire length of the south property line in order <br />to reduce long-term noise impacts. The wall along the Shady Lane residential neighborhood <br />shall be of slumpstone material. Subject to f'mal grading plans, the sound wall shall be a <br />minimum of eight feet on the project side and a maximum of ten feet on the adjacent <br />property to the south. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.