Laserfiche WebLink
RESOLUTION 94-023 <br /> <br />490 <br /> <br />41. <br /> <br />42. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of Certificate of <br />Occupancy for Smiths or within 48 <br />hours of removal of plywood fence; <br />subject to final grading plan approval <br /> <br />Amhitecmral, building and grading <br />plan check, ce~ficate of occupancy <br /> <br />Re _sponsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner, Planning Division; Senior <br />Plan Check Engineer, Building <br />Division <br /> <br />The loading dock for Smiths shall be located on the westerly side of the building fronting <br />Williams Street rather than at the back (south) side of the building to minimize noise <br />impacts to residents directly souUh of the project site. In addition, the loading dock shall be <br />designed so that the access is down a ramp from street level further helping to attenuate any <br />noise creaW~d in the loading area. <br /> <br />Timin~ o f lmnlementation/Verification <br /> <br />Prior to building permit <br />issuance <br /> <br />V ' i <br /> <br />Building plan check <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner, Planning Division; Senior <br />Plan Check Engineer, Building <br />Division <br /> <br />The project sponsor shall construct a sound shield around the air conditioners at the Smith's <br />store that provides 5 dBA of sound reduction to the south for all equipment located within <br />100 feet of the south property line to keep the ambient noise level wiilfin acceptable limits. <br /> <br />Timine of lmolementation/Verification <br /> <br />CC&Rs; prior to issuance of building <br />and mechanical permits; prior to <br />issuance of Certificate of Occupancy <br /> <br />Method of Verification <br /> <br />Review of CC&Rs; building, <br />architectural and mechanical <br />construction drawings in plan check; <br />field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner, Planning Division; Senior <br />Plan Check Engineer, Building <br />Division <br /> <br />-17- <br /> <br /> <br />