My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
494 RESOLUTION 94-023 <br /> <br />Erect an eight foot (8') wall on the south side of the open loading docks on Buildings D <br />through F. Buildings G and H do not require a wall because the loading area is between <br />buildings. <br /> <br />Timine of Implementation/Verification <br /> <br />Prior to issuance of building permits <br />or Certificates of Occupancy <br /> <br />Plan check of construction <br />drawings; field inspection <br /> <br />~$ponsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner, Planning Division; Senior <br />Plan Check Engineer. Inspection <br />Services Manager, Building <br />Division <br /> <br />ENERGY <br /> <br />53. <br /> <br />The new shopping center will be constructed to comply with Title 24 of the California Code <br />of Regulations established by the California Energy Commission regarding energy <br />conservation standards. These standards relate to insulation requirements, glazing, lighting, <br />shading, and water and space heating systems. <br /> <br />Timine of lmolementation/Vefificafion <br /> <br />Prior to issuance of building permits <br />or Certificates of Occupancy <br /> <br />[Method of Verification <br /> <br />Plan check of constmction <br />drawings; field inspection <br /> <br />Res[mnsible Parties <br /> <br />Environmental Coordinaton Planning <br />Division; Senior Plan Check <br />Engineer, Building Division <br /> <br />54. The project sponsor shall consult with the Southern California Edison Company and the <br /> Southern California Gas Company regarding feasible energy conservation measures that <br /> could be incorporated into the design of the project. <br /> <br />Timine of Imnlementation/Verification <br /> <br />Prior to building/occupancy permit <br />issuance <br /> <br />Method of Verification <br /> <br />Plan check of construction drawings <br /> <br />Resrmnsibte Parties <br /> <br />Environmental Coordinator. Planning <br />Division; Senior Plan Check <br />Engineer, Building Division <br /> <br />55. Install occupant controlled light switches and thermostats to permit individual adjusUnent of <br /> lighting and HVAC. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.