Laserfiche WebLink
Timing of lmt~lementation/Verification <br /> <br />Prior to issuance of building permits <br />or Certificates of Occupancy <br /> <br />Method of V~lSfication <br /> <br />Plan check of construction drawings; <br />field hqspection <br /> <br />Restxmsible Parties <br /> <br />Senior Plan Check Engineer, Building <br />Division <br /> <br />56. Control mechanical systems (HVAC and lighting) in the buildings with timing systems to <br /> prevent accidental or inappropriate conditioning or lighting of unoccupied space. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of building permits <br />or Certificates of Occupancy <br /> <br />Method of Verification <br /> <br />Plan check of construction drawings; <br />field inspection <br /> <br />Responsible Parties <br /> <br />Senior Plan Check Engineer, Building <br />Division <br /> <br />57. Built-in appliances, refrigerators, and space-conditioning equipment shoulfl exceed the <br /> minimum efficiency levels mandated in the California Code of Regulations. <br /> <br />Timing Of Implementation/Veil ficarion <br /> <br />Prior to issuance of building permits <br />or Ce~ficates of Occupancy <br /> <br />Method of Verification <br /> <br />Plan check of construction drawings; <br />field inspection <br /> <br />Responsible Parties <br /> <br />Senior Plan Check Engineer, Building <br />Division <br /> <br />58. Implementation of a TDMP (mitigation measure 17). <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of Certificates of <br />Occupancy; on-going during life of <br />project <br /> <br />Method of Verification <br /> <br />Written report provided by the <br />project sponsor or representative <br />annually and recorded in project <br />CC&Rs <br /> <br />Responsible Pgrties <br /> <br />Planning Division; Engineering <br />Services Manager, Development <br />Engineering Division, Project Sponsor <br />or representative <br /> <br />-22- <br /> <br /> <br />