Laserfiche WebLink
Police Services <br /> <br />62. <br /> <br />The project sponsor shall consult with the City of Santa Ana Police Department's Crime <br />Prevention Unit on the design and implementation of a security plan for the project. This <br />plan shall be approved by the Chief of Police. The security plan will require the use of <br />private security guards to monitor and patrol the project site during construction and <br />operation. Said security guard obligation shall be reviewed with the Police Department of <br />Santa Ana after six months of Smith's Superstore opening and annually thereafter for any <br />modification to the security obligation based upon observations by the Parcel owners and <br />Police Deparunent incident reports. <br /> <br />Timine of ltrlplementation/Veri fication <br /> <br />Plan check, during construction, on- <br />going during the life of the project <br /> <br />Method of Verification <br /> <br />Plan check review; field <br />inspections <br /> <br />Responsible Parties <br /> <br />Case Planner, Planning Department; <br />Engineering Services Manager. <br />Development Engineering Division; <br />Community Services Specialist. <br />Police Depamnent: Senior Plan Check <br />Engineer, Inspection Services <br />Manager. Building Division <br /> <br />63. The site will be designed with parking areas that provide good il/umination, minimum dead <br /> space, and maximum store visibility to eliminate areas of concealment and opportunities for <br /> crime. <br /> <br />Timin~ of Iml~lem entationFv'erification <br /> <br />Prior to issuance Certificate of <br />Occupancy; plan check; and on-going <br />during the life of the project <br /> <br />Method of V~rifieation <br /> <br />Plan check review; field <br />inspections <br /> <br />Responsible Parties <br /> <br />Case Planner, Planning Division; <br />Senior Plan Check Engineer. <br />Inspection Services Manager. <br />Building Division; Community <br />Services Specialist, Police <br />Depamnent <br /> <br />64. The project sponsor shall be responsible for maintaining the premises free of graffiti. All <br /> graffiti shall be removed within 24 hours of its occurrence. <br /> <br />Timin~ of Implementation/Verification <br /> <br />On-going during the life of the project <br /> <br />Method of Verification <br /> <br />Field inspections <br /> <br />-24- <br /> <br /> <br />