My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 94-023 <br /> <br />PUBLIC SERVICESAJTIL1TIkS <br /> <br />Fire Protection and Emergency Services <br /> <br />59. <br /> <br />Thc project sponsor shall COnsult with the Santa Aha Fire Departraent during project design <br />and prior to imtial occupancy of the buildings to discuss and implement such features as <br />emergency access and emergency evacuation plans. Definitive plans and specifications <br />shall be submitted to the SAFD prior to issuance of occupancy permits. Requirements for <br />necessary permits must be satisfied prior to commencement of any portion of the proposed <br />project. The project sponsor has submitted the final site plan, which shows the accessways <br />and turning areas for Fire Department approval. <br /> <br />Timin~ of lmnlementation/Vefification <br /> <br />During project design and prior to <br />initial Certificate of Occupancy <br /> <br />Method of Verification <br /> <br />Plan check review <br /> <br />Responsible Parties <br /> <br />Case Planner, Planning Division; <br />Senior Plan Check Engineer, <br />Building Division; Fire Marshall, Fire <br />Department <br /> <br />60. The project shall comply with all applicable City and State fire codes and ordinances as well <br /> as the Public Safety Element of the General Plan. <br /> <br />Timin~ of Implementation/Verification <br /> <br />Prior to issuance Certificates of <br />Occupancy; on-going during the life <br />of the project <br /> <br />Method of Verification <br /> <br />Plan check; periodic field <br />inspections <br /> <br />Resoonsible Par~ies <br /> <br />Senior Plan Check Engineer, <br />Inspection Services Manager <br />Building Division; Fire Marshal, Fire <br />Department <br /> <br />61. Sprinkler systems shall be required, in accordance with the Santa Ana Fire and Building <br /> code requirements. <br /> <br />Timine of Implementation/Verification <br /> <br />Plan Check; prior to issuance of <br />Certificates of Occupancy <br /> <br />Method of Verification <br /> <br />Plan check; field inspections <br /> <br />Responsible Par~ies <br /> <br />Senior Plan Check Engineer, <br />Inspection Services Manager, <br />Building Division: Fire Marshal, Fire <br />Department <br /> <br />-23- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.