My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50Z RESOLUTION 94-023 <br /> <br />77. <br /> <br />Prior to issuance of grading permits the project sponsors shall submit a haul route for the <br />removal of construction related solid waste which would include measures to reduce dust <br />and control dirt spilled on roadways. <br /> <br />Timine of Imnlementation/Verification <br /> <br />Prior to grading permit issuance <br /> <br />V 'ir i n <br /> <br />Grading plan check; inspection during <br />construction <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Planning <br />Division; Engineering Services <br />Manager, Development Engineering <br />Division <br /> <br />78. <br /> <br />The sponsors shall explore recycling or other means of disposing of excess soil rather than <br />disposal in a landfill. Soil excavated during construction could be used at other <br />construction sites within the area requiring fill for projects, and may not need to be <br />transported to a landfill. Asphalt removed from the project site can be sold to blacktop <br />recycling companies. <br /> <br />Timin~z of Imnlementation/Verificatioll <br /> <br />During construction <br /> <br />'Method of Verification <br /> <br />Grading plan check; field <br />investigation <br /> <br />Responsible Parties <br /> <br />Environmental Coordinaton Planning <br />Division; Engineering Services <br />Manager, Development Engineering <br />Division; Project Sponsor <br /> <br />79. In accordance with the City's Solid Waste Integrated Management Plan. the project sponsor <br /> shall prepare and submit a Source Reduction and Recycling Plan to the Public Works <br /> Agency and the Planning Division, prior to issuance of occupancy permits. The Plan shall <br /> document and outline the incorporation of an on-site recycling/conservation program. <br /> <br />Timine of Implementation/Verification <br /> <br />Prior to issuance of CeMficate of <br />Occupancy of the first building; plan <br />check <br /> <br />Method of Verification <br /> <br />Project sponsor or representative to <br />submit a written plan; plan check <br /> <br />Resr~onsible Parties <br /> <br />Environmental Coordinator, Planning <br />Division; Engineering Services <br />Manager, Development Engineering <br />Division: Enterprise Coordinator, <br />Public Works Agency <br /> <br />-29- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.