Laserfiche WebLink
503 <br /> <br />80. The design oftbe recycling system shall facilitate source separation and collection of <br /> additional materials that may be designated a~ recyclable by the City in the future. <br /> <br />Timing of Implementation/Verification <br /> <br />On-going program <br /> <br />Method of Verification <br /> <br />Review of project sponsor's plan and <br />inspections <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Planning <br />Division; Engineering Services <br />Manager, Engineering Division <br /> <br />81. Prior to issuance of Certificate of Occupancy for Smith's, the Gateway Center merchants <br /> shall form an agreement to monitor litter cleanup on a daily basis. This cleanup program <br /> will be defined as set forth in the CC&Rs and funded by all parties. <br /> <br />Timin~ of Implementation/Verification <br /> <br />Prior to issuance of Certificate of <br />Occupancy; CC&Rs <br /> <br />Method of Verification <br /> <br />Review CC&Rs <br /> <br />Re _sponsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner. Planning Division; tenants <br />and Project Sponsor <br /> <br />GEOLOGY/HYDROLOGY <br /> <br />Grading <br /> <br />82. <br /> <br />Prior to issuance of grading permits, all plans and calculations for grading, on-site <br />conveyance of drainage and interim erosion control shall be submitted to the Environmental <br />Coordinator, the Public Works Agency and Building Safety Division for Plan Check. <br /> <br />Timing of lm~lementationfVerification <br /> <br />Prior to grading permit <br />issuance; during grading <br />operation <br /> <br />M~[hod of Verification <br /> <br />Grading plan check and/or field <br />inspection during grading <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, <br />Planning Division; Inspection <br />Services Manager, Building <br />Division; Engineering <br />Services Manager, Development <br />Engineering Division <br /> <br />83. <br /> <br />Prior to commencement of grading, qualified geotechnicai consultants (soils engineer, <br />engineering geologist, and their representatives) shall be employed for the purpose of <br /> -30- <br /> <br /> <br />