My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
508 RESOLUTION 94-023 <br /> <br />95. <br /> <br />Should any project-generated sediment be deposited in City or County storm drains, the <br />project sponsor shall immediately fund any required clean-up to the satisfaction of the City <br />of Santa Ana Public Works Agency and the Orange County Flood Control District. <br /> <br />Timin~ of lmnlementation/Verification <br /> <br />Condition of grading permit (note on <br />grading plan); on-going during life of <br />project <br /> <br />Grading plan check and/or field <br />inspection <br /> <br />Restmnsible Parties <br />Development <br /> <br />Engineering Services Manager, <br />Engineering Division; Water <br />Resources Manager, Water <br />Resources Division: Project Sponsor <br /> <br />96. <br /> <br />The project sponsor shall file a report with the City of Santa )ma Public Works Agency and <br />the Regional Water Quality Control Board (RWQCB) which complies with the National <br />Pollution Discharge Elimination System (NPDES) permit for stormwater discharge, <br />including the full description of the discharge and the demonstration of compliance with <br />EPA specified effluent limits. The project sponsor shall Comply with the guidance and <br />policies of the City Engineer and the RWQCB. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification <br /> <br />Surface drainage and grading plan <br />check <br /> <br />Responsible Parties <br /> <br />Regional Water Quality Control <br />Board; Orange County Flood Control <br />District; Engineering Services <br />Manager, Development <br />Engineering Division; Water <br />Resources Manager, Water <br />Resources Division; Project Sponsor <br /> <br />97. The project sponsor shall prepare a comprehensive, long-term post-construction stormwater <br /> management plan, incorporating structural and non-structural best management practices. <br /> <br />Timing of lmnlement afl on/Verification <br /> <br />Prior to grading permit issuance <br /> <br />Surface drainage and grading plan <br />check <br /> <br />Res_t~nsible Parties <br /> <br />Regional Water Quality Control <br />Board: Orange County Flood Control <br />District: Engineering Services <br />Manager, Development <br />Engineering Division; Water <br /> <br />-35- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.