Laserfiche WebLink
92. During periods of rain or when water is used during construction, runoff shall be diverted <br /> from areas exposed by construction through the use of berms (sand bags) or other such <br /> devise to minimize stormwater contamination and prevent sediment-filled runoff from being <br /> deposited in City storm drains. <br /> <br />Timin~ of Imnlementation/Verification <br /> <br />Condition of grading (note on grading <br />plan) and building permits; weekly <br />inspection during consa'uction <br /> <br />Grading plan check; field <br />inspection <br /> <br />Re _sponsible Parties <br /> <br />Engineering Services Manager, <br />Developraent Engineering <br />Division <br /> <br />93. <br /> <br />Parking area maintenance and sweeping shall be conducted a minimum of three times a <br />week (without the use of water) to reduce the amount of pollutants entering the City storm <br />drain system. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of Cerdficates of <br />Occupancy; included in CC&Rs <br /> <br />Review CC&Rs, written notice <br />from project sponsor or representative <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, <br />Planning Division; Engineering <br />Services Manager, Public Works <br />Agency <br /> <br />94. <br /> <br />Hazardous materials used by future tenants (dry cleaning, auto parts stores, etc.), shall be <br />properly stored andlocated to prevent contact with precipitation or runoff. All receptacles <br />containing toxic materials shall be protected from rainfall so that runoff from the project site <br />does not contain contaminants. Effective monitoring and cleanup programs for spills and <br />leaks of hazardous materials shall be prepared by owner for approval by the appropriate <br />agencies (Santa Aha Fire Department, Santa Ana Planning Division, County Health <br />Agency, etc.). <br /> <br />Ti~irm of Implementation/Verification <br /> <br />Prior to Certificate of Occupancy <br />issuance <br /> <br />Method of Verification <br /> <br />Review CC&Rs; building plan check; <br />periodic field inspections <br /> <br />Responsible Parties <br /> <br />Enviromental Coordinator, Case <br />Planner, Planning Division; Fire <br />Marshall, Fire Depamnent <br /> <br />-34- <br /> <br /> <br />