Laserfiche WebLink
25. <br /> <br />26. <br /> <br />27. <br /> <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br />- Monitoring Agency: <br /> <br />City Planning and Building Agency <br /> <br />Throughout Specific Plan implementation <br /> <br />Review and approval of development proposals <br />within the flood zone to determine floor <br />elevations <br /> <br />City Public Works Agency and Planning and <br />Building Agency <br /> <br />If appropriate, in conjunction with submittal of applications for grading permits, future <br />applicants shall submit to the City Public Works Agency, detailed drainage studies showing <br />that future grading, in conjunction with drainage conveyance systems, would ensure that <br /> <br />future structures are safe from flooding. <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br />- Monitoring Agency: <br /> <br />Future applicants <br /> <br />Prior to issuance of grading pennit <br /> <br />Review and approval of grading plans and <br />drainage studies <br /> <br />City Public Works Agency and Planning and <br />Building Agency <br /> <br />Prior to issuance of grading permits, if surface water is collected anywhere for discharge as <br />a point source, if a point source discharge is contemplated or ff the affected site exceeds five <br />acres, the applicant shall obtain a National Pollution Discharge Elimination System Permit <br />(NPDES) and Notice of Intent from the Santa Ana Regional Water Quality Board. <br /> <br />- Responsible for Implementation: <br /> <br />Future applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to issuance of grading permit <br /> <br />- Method of Monitoring: <br /> <br />Applicants provide proof of NPDES permit and <br />Notice of Intent <br /> <br />- Monitoring Agency: <br /> <br />City Public Works Agency <br /> <br />Prior to issuance of grading permits, the City Public Works Agency, shall require future <br />projects to comply with the following, as necessary. Appropriate projects shall: <br /> <br />Coordinate with the County's Environmental Management Agency to ensure Orange <br />County Flood Control District facilities are not significantly affected. <br /> <br />MITIGATION MONITORING PROGRAM/MIDTOWN DISTRICT SPECIFIC PLAN/EIR NO. 94-1 10 <br /> <br /> <br />