Laserfiche WebLink
488 <br /> <br />eo <br /> <br />Coordinate with the RWQCB to ensure compliance and consistency with policies and <br />regulations of the RWQCB's Santa Ana Region Water Quality Control Basin Plan. <br /> <br />Incorporate special construction notes as recommended in Orange County's Drainage <br />Area Management Plan (DAMP)-New Development Appendix. <br /> <br />Incorporate Federal EPA/NOAA guidance measures for coastal nonpoint source <br />pollution into project designs. <br /> <br />Incorporate appropriate measures from the State Municipal BMP Manual and ensure <br />non-structural BMPs are consistent with the DAMP-New Development Appendix, <br /> <br />Prepare long-term post-construction Master Water Quality Management Plans <br />(WQMP) that describe commitments to installing and maintaining structural facilities. <br />The plan would also list routine and minimum BMPs, address common area <br />landscape areas, and catch basin stenciling. <br /> <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br /> - Monitoring Agency: <br />AIR QUALITY <br />Construction Mitieation <br /> <br />28. <br /> <br />Future applicants <br /> <br />Prior to issuance of grading permit <br /> <br />Applicants provide proof of compliance with <br />mitigation and prepare required documents <br /> <br />City Public Works Agency and RWQCB <br /> <br />Future contractors shall implement the following measures throughout construction activities: <br />a. Comply with Rules 401 - 403 of the SCAQMD to reduce onsite dust levels. <br />b. Periodically apply water and dust superannuates to graded areas. <br />c. Cover any hauling fill. <br /> <br />d. Operate street sweepers on adjacent roadways to remove dirt from construction <br /> vehicles or dried mud carried off by tracks. <br /> <br />e. Stabilize disturbed areas if construction is delayed. <br /> <br />f. Terminate soil disturbance when high winds (greater than 25 miles per hour) occur. <br /> <br />g. Ensure that all construction equipment shall be maintained in proper working order. <br /> <br />MITIGATION MONITORING PROGRAM/MIDTOWN DISTRICT SPECIFIC PLAN/EIR NO. 94-1 11 <br /> <br /> <br />