150 <br /> <br />Timing of Imple~nentation/Verification <br />Responsible Parties <br /> <br />Responsible Parties Public Works Agency: Engineering <br /> Services Manager <br /> <br />The project developer shall implement a Transportation Demand Management (TDM) <br />program aimed at reducing single occupancy vehicle trips generated to and from the <br />project site. The TDM program will be contained in the Covenants, Conditions, and <br />Restrictions (C.C.& R's) associated with the project. <br /> <br /> Condition of certificate of occupancy; on- <br /> going during the life of the project. <br /> <br /> Written report to be provided by the project <br /> applicant or representative annually <br /> <br /> Project applicant; Public Works Agency: <br /> Engineering Services Manager <br /> <br />The project applicant shall request approval ora variance for ten percent reduction in <br /> <br />parking. <br /> <br />Timing of Implement ation/Verification <br /> <br />Prior to site plan approval <br />Building plan check <br /> <br />Planning Division: Case Planner; <br />Environmental Coordinator <br /> <br />One week prior to the start of grading, the applicant shall contact by mail all residents <br />immediately adjacent to the site and advise them to keep windows closed in order to <br /> <br />minimize dust intrusion. <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Prior to start of grading. <br /> <br />Verification of mailing. <br /> <br />Project applicant; Planning Division: Case <br />Planner; Environmental Coordinator <br /> <br />Tile general contractor shall use low emission mobile construction equipment, where <br />feasible. <br /> <br />Timing of Implementation/Verification On-going during project construction <br /> <br />Method of Verification <br /> <br />Visual on-going site inspection during <br />project construction. <br /> <br />10 <br /> <br /> <br />