My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-023 - Home Place Shopping Center Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-023 - Home Place Shopping Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:20 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-23
Date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsible Parties <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator <br /> <br />The general contractor shall water the site and clean equipment morning and evening to <br />comply with the AQMP Fugitive Dust Measures BCM-03 and BCM-06. The general <br />contractor shall water the construction site and unpaved haul roads (with use of reclaimed <br />water or chemical soil binder, where feasible) twice dally. <br /> <br />On-going during project construction. <br /> <br />Method of Verification <br /> <br />Visual site inspection. <br /> <br />Responsible Parties <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator <br /> <br />Construction operations shall include on-site crews that wash offtrucks leaving the site to <br />comply with the AQMP Fugitive Dust Measure BCM-01. <br /> <br />Timing of hnplementation/Verification Condition of grading permit issuance <br /> <br />Grading plan check; periodic field <br />inspections during grading <br /> <br />Responsible Parties <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator. <br /> <br />The general contractor shall apply chemical soil stabilizers according to manufacturer's <br />specifications to all inactive construction areas (previously graded areas which remain <br />inactive for 96 hours). <br /> <br />Timing of Implementation/Verification Condition of grading permit issuance <br /> <br />Grading plan check; periodic field <br />inspections during grading <br /> <br />Responsible Parties <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator. <br /> <br />The general contractor shall sweep streets daily if silt is carded over to adjacent public <br />thoroughfares. <br /> <br />Timing of Implementation/Verification On-going during project construction. <br /> <br />Method of Verification <br /> <br />Visual inspection. <br /> <br />11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.