Laserfiche WebLink
152 <br /> <br />10. <br /> <br />Responsible Parties <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator. <br /> <br />Traffic speeds on all unpaved mad surfaces on-site shall be 5 miles per hour or less. <br /> <br />Timing of Implementation/Verification <br /> <br />On-going during project construction. <br /> <br />Visual site inspection. <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator. <br /> <br />The general contractor shall suspend grading operations during first and second stage <br />smog alerts. <br /> <br />Timing of Implementation/Verification On-going during project grading. <br /> <br />Visual on-site inspection. <br /> <br />Responsible Parties <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator. <br /> <br />The general contractor shall suspend all grading operations when wind speeds (as <br />instantaneous gusts) exceed 25 miles per hour. <br /> <br />Timing oflmplemantation/Verification On-going during project grading. <br /> <br />Visual on-site inspection. <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator. <br /> <br />The general contractor shall maintain construction equipmem engines by keeping them <br />properly tuned. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to start of grading and on-going <br />during project grading. <br /> <br />Visual site inspection. <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Environmental <br />Coordinator <br /> <br />12 <br /> <br /> <br />