My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-023 - Home Place Shopping Center Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-023 - Home Place Shopping Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:20 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-23
Date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. <br /> <br />20. <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Case Planner; <br />Environmental Coordinator <br /> <br />Parking lot sweeping or outdoor clean up activity in parking areas to the north of the front <br />building elevations for buildings 1, 2 and 3 shall be limited to the hours of 7 AM to 10 <br />PM. <br /> <br />Timing of Implementation/Verification During project operation <br /> <br />Responsible Parties <br /> <br />Periodic inspection. <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Case Planner; <br />Environmental Coordinator <br /> <br />Parking lot sweeping or outdoor clean up activity in parking areas to the south of the front <br />of buildings 1, 2 and 3 shall be limited to the hours of 7:00 AM to midnight. <br /> <br />Timing oflmplementation/Verification During project operation <br /> <br />Periodic inspection. <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Case Planner; <br />Environmental Coordinator <br /> <br />The project shall be reviewed by the Energy Services New Construction Department at <br />Southern California Edison to determine those measures that can be incorporated into a <br />project to reduce electrical demands. The project developer shall incorporate all measures <br />into the project as economically feasible as determined by the City Building Division. <br /> <br />Timing of Implementation/Verification <br />Responsible Parties <br /> <br />Prior to issuance of a building permit. <br />Building plan check <br /> <br />Building Division: Senior Plan Check <br />Engineer <br /> <br />The project shall meet all applicable State of California Title 24 Energy guidelines. <br /> <br />Timing of Implementation/Verification <br />Responsible Parties <br /> <br /> Prior to issuance of a building permit. <br /> Building plan check <br /> <br /> Building Division: Senior Plan Check <br /> Engineer <br /> <br />18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.