My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-023 - Home Place Shopping Center Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-023 - Home Place Shopping Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:20 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-23
Date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
159 <br /> <br />Public Services and Utilities <br /> <br />Police Protection <br /> <br />1. No parking shall be allowed along the northern project bounda~. <br /> <br />Timing of lmplementationFVerificatinn Prior to issuance of a building permit. <br /> <br />Building plan check <br /> <br />Building Division: Senior Plan Check <br />Engineer; Planning Division: Case Planner; <br />Environmental Coordinator <br /> <br />The project applicant will be required to provide parking area security patrols, but only at <br />such time as parking spaces are actually striped and available for public use on the west <br />side of Retail Building 3 north of the building storefront. Such patrols will be required <br />only during the hours fxom sundown until one-half hour after the stores close. Six months <br />after implementation and annually thereafter, this mitigation measure will be reviewed by <br />the Santa Ana Police Department for possible modifications based upon observations by <br />the property owner and review of Police Department incident reports. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of an occupancy permit and <br />during building occupancy. <br /> <br />Occupancy permit on on-going site <br />inspection. <br /> <br />Building Division: Senior Plan Check <br />Engineer; Inspection Services Manager; <br />Planning Division: Case Planner; <br />Environmental Coordinator; Police <br />Department: Community Services Specialist <br /> <br />Water Service <br /> <br />Water conservation and management techniques shall be incorporated into the design, <br />construction and operation of the project, including the use of fixtures that use reduced <br />volumes of water, landscaping irrigation in early morning and evening hours to reduce <br />water lost to evaporative and incorporate drought tolerant plant species for new <br />landscaping. <br /> <br />Timing of Implementation/Verification Plan check; during construction <br /> <br />Inspection of landscape plan <br /> <br />Building Division: Senior Plan Check <br />Engineer; Planning Division: Case Planner; <br /> <br />19 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.