My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-023 - Home Place Shopping Center Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-023 - Home Place Shopping Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:20 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-23
Date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Coordinator; Landscape <br />Associate <br /> <br />The City of Santa Aaa Fire Department will determine the precise fire flow requirements <br />fi.om the proposed project during its review of the final project plan. The design and <br />implementation of any required on-site improvement to provide the fire flow requirement <br />determined during site plan review shall be borne by the project developer. <br /> <br />Timing of Implementation/Verification Plan check <br /> <br />Review and inspection <br /> <br />Fire Department: Fire Marshall; Public <br />Works Agency; Water Resources Manager <br /> <br />Wastewater Service <br /> <br />Prior to the issuance of building permits, the project sponsor shall obtain all permits and <br />pay all fees required by the City in order to provide an acceptable level of sewage <br />treatment service. <br /> <br />Timing of Implementation/Verification Prior to issuance of a building permit. <br /> <br />Building plan check and cancelled check <br /> <br />Building Division: Senior Plan Check <br />Engineer; Public Works Agency; Engineering <br />Services Manager <br /> <br />Solid Waste <br /> <br />The City shall encourage recycling of materials generated on the site during both project <br />construction and the life of the project by encouraging contractors to recycle construction <br />debris when feasible and use recyclable materials for construction. <br /> <br />Timing of hnplementation/Verification <br /> <br />Prior to issuance of a building permit on- <br />going throughout the life of the project. <br /> <br />Building plan check and visual site <br />inspection. <br /> <br />Public Works Agency: Engineering Services <br />Manager; Planning Division: Environmental <br />Coordinator <br /> <br />In accordance with the City's Solid Waste Integrated Management Plan, the project <br />developer shall prepare and submit a Source Reduction and Recycling Plan to the Public <br />Works Agency and the Planning Division, prior to the issuance of occupancy permits. The <br /> <br />20 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.